RR230Raider on the River
Aluminum hull sitting in a steel build jig on the shop floor

Log 01/ Cumberland River · Clarksville, Tennessee

The purchase story

Every messy step of shopping aluminum boats and finally landing on a Raider Coastal 230, told the way it happened.

Photo: Hull in the build jig · Jul 20, 2026

  1. Mile 01

    Before the buy

    Wanting the water every day

    I've wanted a boat for about 30 years, and after I sank a Sea-Doo on the Red River I wanted one that could take river chop and still feel like home on the Cumberland. So I shopped hard and asked a lot of dumb questions and tried not to fall for the first shiny listing I saw.

  2. Mile 02

    January 2026

    Weldcraft enters the chat

    It started with a Weldcraft 210 Revolution build request, and Reed Yacht Sales followed up fast. That one was a real option with workboat bones and a serious fishing layout, and it made me get specific about what I actually wanted.

  3. Mile 03

    Late January

    Raider shows up, and so does everything else

    Around the same few days Pop Yachts was sending me used Raider 210 Explorers, Tobler Marina had a Duckworth in the mix, and Kylo Matlock at Selkirk sent over a Raider 21D / Delta build sheet, plus the insurance intros started, so the shortlist got kinda loud.

  4. Close view of aluminum frames and stringers clamped and tack welded inside the hull
    Frames and stringers clamped and tacked · Jul 20, 2026
  5. Mile 04

    February

    Delta options, then Coastal 230

    Lots of back and forth with Selkirk and a $1k show deposit to hold a slot, and then I sized up to the Coastal 230 with pretty much the same options I'd picked for the Delta, the Honda 350 and Kraken and second station and Shockwave seats and AquaTraction. The final build sheet came together in late February.

  6. Mile 05

    March → June

    Deposits, Doreen, Ride, shore power

    The down payment went in in March and I traded AquaTraction samples back and forth, then put the name Doreen on the fishbox lid. Seakeeper Ride trim tabs went on the contract along with extra sea-trial time, and in June I added the full shore-power package so she can live in a slip. The Build page has every piece of gear.