RR230Raider on the River
Full side profile of the hull with cabin, hardtop and bow rails at Raider

Log 05/ Shop floor

Gallery

The full build of Doreen, a 2026 Raider Coastal 230, as she came together out of bare plate between July and October, with 24 shop photos, newest first, plus build films, a river film and the channel intro.

Photo: Full profile with hardtop and bow rails · Aug 27, 2026

What's here

  • 7 films, 1 to 6 minutes each, newest first, widescreen and vertical
  • 13 Shorts, under a minute each
  • 24 shop photos, Jul 20 to Oct 8, 2026
  • Shot at Raider Aluminum Boats, Colville, WA

Share this page

Film 07 · Channel intro

I'm 50, I Sank My Jet Ski, and Now I'm Getting a Raider

I've wanted a boat my whole life. Then I sank my Sea-Doo Fish Pro Trophy on the Cumberland at about 60 mph and a police airboat came to get us. Two years of saving later, I ordered a Raider. This is the intro to the channel and what we plan to do with her around Nashville, Lake Barkley and Donelson.

4:20 · Sound on

Film 06 · The routes

Left or Right? Cumberland River Routes

Pull out of Clarksville Marina at Mile 127.4 and you have two ways to go. Upstream is 63.8 river miles to the Nashville riverfront with one lock at Cheatham. Downstream is 94.6 miles to the Barkley Canal with no locks at all, or 96.8 to Barkley Lock and Dam. We traced both on the map, then covered what lives in the water and what every season looks like out there.

6:14 · Sound on

Film 05 · Music video

DOREEN

Every build photo we have, from the July jig to the welded RAIDER logo, the cabin, the helm and the rod holders up top, plus the walkthrough the Raider crew shot this month. Cut to a track I made in Suno.

3:14 · Sound up

Film 04 · The river

The Cumberland: A River Story

Doreen's home water, from a 460 million year old sea floor to Donelson's flotilla, steamboats and dark-fired tobacco, Fort Donelson and Fort Defiance, Clarksville and the Screaming Eagles, and the Corps locks and dams.

1:58 · Sound on

Widescreen · 16:9Watch on YouTube ↗Download MP4
Vertical · 9:16 Shorts / ReelsYouTube Short ↗MP4

Film 03 · July to October 2026

The Build Story: Jul to Oct

The whole build so far, from the jig in July to the helm and second station in October. Fourteen chapters with plain captions, the build sheet and factory specs, and a thank you to the crew at Raider.

2:57 · Sound on

Widescreen · 16:9Download MP4
Vertical · 9:16 Shorts / ReelsMP4

Film 02 · The Build Story

Built at Raider: The Build Story

Chapter by chapter through the hull build, with what you are looking at and why it matters, the numbers off the build sheet and Raider's factory specs, and a thank you to the crew in Colville.

1:55 · Sound on

Widescreen · 16:9Download MP4
Vertical · 9:16 Shorts / ReelsMP4

Film 01 · July 2026

Build Log: Hull Build

Six shop photos, jig to fish box, cut to the beat. Ten days of the build in about a minute.

1:05 · Sound on

Widescreen · 16:9Download MP4
Vertical · 9:16 Shorts / ReelsMP4

13 Shorts · newest first

Build Shorts

More on YouTube ↗
I Sank My Jet Ski at 60 MPH
Why I Picked a Raider
50 Years Old and Finally Getting My Boat
My Number One Goal for This Channel
Why I Chose a Raider
Walkthrough: Door to Rod Holders
Inside the Cabin: Helm and Seating
Flat Plate to a Welded Raider Logo
Fish Box: Floor Frames to Sealed Deck
Hardtop: Cabin to Rod Holders
Helm: Console, Dash, Steering and Throttle
Transom and Back Deck: Plate to Hardware
Before and After: Jig to Finished Hull

24 shop photos · newest first

Oct 8 back to Jul 20

The build films are also up on YouTube.

Second station at the bulkhead with engine controlOct 8, 2026
Helm dash: throttle, switch panel, display cutoutOct 8, 2026
Transom hardware ready to mountOct 8, 2026
Bow flare and rails from the front quarterOct 8, 2026
Hull and hardtop, side profileSep 21, 2026
Welded storage boxes in the cabinSep 14, 2026
Helm and passenger sideSep 14, 2026
Cabin interior, helm and seat boxesSep 14, 2026
Transom work station with welded wellsSep 14, 2026
Looking forward from the cockpit to the helmSep 14, 2026
Raider badge, hardtop and rod holdersSep 14, 2026
Deck plate and hatch openingsAug 27, 2026
Transom wells from aboveAug 27, 2026
Cockpit deck plate going downAug 27, 2026
Full profile with hardtop and bow railsAug 27, 2026
Raider logo pressed into the hull sideAug 25, 2026
Cabin welded on, hull on the shop cartAug 10, 2026
Cabin bulkhead seen from the cockpitJul 30, 2026
Welded fish box and sink wellsJul 30, 2026
Cabin bulkhead and deck framingJul 30, 2026
Hull sides, rub rails and the cabin bulkhead going upJul 30, 2026
Plate fit-up on the jigJul 20, 2026
Frames and stringers clamped and tackedJul 20, 2026
Hull in the build jigJul 20, 2026